Rewheel Technical Assurance 1
Client: Pluspetrol Peru Corporation
Field (Type): Camisea (Gas & Condensate production; Onshore Peru)
Objectives:
The client wanted to rebundle two centrifugal compressors as part of the ongoing development of the asset to meet current duties (lower wellhead pressures)
The newly rebundled compression trains would move from 2 X 100% operation to 2 x 50% with load sharing
The client wanted to review the new compressor bundles maximum capacity performance in preparation for the revamp work
The client also wanted to clarify their understanding of load-sharing controller algorithm which will be used for the first time with the operational changes
Challenge: The key driver for the rewheeling of two compression trains was the declining pressures of the Pagoreni reservoirs.
Our Engagement: Eta was engaged as Engineering Consultants because of its unique gas compression expertise and understanding of the client’s asset portfolio.
Approach: compressor performance analysis, modelling, and simulation
Stake: Inability to fully ascertain that the revamped compressors had the capacity to fulfil the new duties. Lack of technical assurance and peace of mind of the seamless transition to load-sharing control.
Results:
The ability of the newly rewheeled compression trains to meet the new process duties was successfully demonstrated for the client’s benefit
The expected as-installed performance of the rebundled compression trains was successfully quantified
A clear demonstration of how the load-sharing controller algorithm should work was successfully made for the benefit of the client